Fixed costs do not change with output over the specified horizon; variable costs do, and their sum is total cost.

Read first
Short run and long run
Related
Sunk costs
Further reading
OpenStax Principles of Economics 3e — Costs in the short run
0 1 2 3 4 5 6 0 12 24 36 48 60 output / units per period cost / € per period variable cost€24 at q = 4 fixed cost€12 total cost
Hypothetical costs in € per production period: FC = 12, VC = 2q + q², TC = FC + VC. At q = 0, total cost remains 12. Fixed costs need not be sunk.